67 / 67 Florida counties, live

Pull a manufactured-home permit that gets approved.

Turn an address and a data plate into a county-ready packet, validated against the county code before you submit, and tracked all the way to the certificate of occupancy.

Book a demo See how it works
67 / 67
Florida counties
5 checks
run before you submit
Minutes
address to filed packet
OAK RIDGE RD · 60' R/WMFD HOME28' x 56'W75'-0" MINREAR 25'FRONT 25'10'NSITE PLAN1450 OAK RIDGE RDLAKELAND, FLPOLK COUNTYZONING ARSCALE 1"=20'SHEET SP-1VALIDATED0 BLOCKERS · READY TO SUBMIT
Every manufacturer. Every model.
If the home carries a HUD data plate, the engine reads it and builds the right packet. No maker is a special case.
ClaytonChampionJacobsenHomes of MeritNobilityPalm HarborLive Oak+ every other lineClaytonChampionJacobsenHomes of MeritNobilityPalm HarborLive Oak+ every other line

Permits are where the deal stalls.

The home is sold and the crew is ready, then the county sends the packet back. It does not have to go that way.

The old way
Manual, or generic software
Set the home, then learn the district never allowed it. A denied certificate of occupancy after the work is done.
Submit without a wind zone rating or a required separation, and the packet drops to the back of the county queue.
Pull setbacks county by county, by hand, on a spreadsheet, for every single job.
With Piermits
Validated before you submit
District, setbacks and flood pulled for the exact parcel and cited, before the home is ordered.
Wind zone, anchoring and septic separations cross-checked against the county code before you submit.
One validated packet, held until it is clean, tracked all the way to the certificate of occupancy.

From a lot to a filed permit, in minutes.

Three steps, no surveyor scramble, no rejected packets.

STEP 1
Drop in the site
Enter the address or parcel and snap the data plate. County records, zoning, flood, wind zone and the home specs fill themselves.
STEP 2
We validate it
Setbacks for the parcel district, wind zone, flood, anchoring and septic separations are checked against the county code, with the rule cited, before anything is filed.
STEP 3
Packet is ready
Site plan, blocking, anchoring, NOC and the official county worksheet, generated and tracked all the way to the certificate of occupancy.
1450 Oak Ridge Rd, Lakeland, FL · Polk County
Permit readiness
Wind zone OK, home WZ II on a WZ II site
Fits the buildable envelope after setbacks
Well to septic 75 ft separation met
0 blockers, ready to submit
Cited to the code
Zoning districtAR
Setbacks (f / s / r)25 / 10 / 25
CitationLDC Sec. 228
Wind zoneWZ II
Flood zoneX
Manufactured homes being set across a Florida community
Set across Florida, county by county.
From the lot to the certificate of occupancy, in every county we cover.

The only permit engine built for mobile homes. Every Florida county.

Generic construction software does not know wind zones, blocking, anchoring, or the per-district setbacks that decide whether a home can even be set on a lot. We do, for all 67 Florida counties, with the rule cited.

LDC Sec. 6.01.0124 CFR 3280.5FL DOH 64E-6
67/ 67Florida counties, live
Alachua CountyBaker CountyBay CountyBradford CountyBrevard CountyBroward CountyCalhoun CountyCharlotte CountyCitrus CountyClay CountyCollier CountyColumbia CountyDeSoto CountyDixie CountyDuval CountyEscambia CountyFlagler CountyFranklin CountyGadsden CountyGilchrist CountyGlades CountyGulf CountyHamilton CountyHardee CountyHendry CountyHernando CountyHighlands CountyHillsborough CountyHolmes CountyIndian River CountyJackson CountyJefferson CountyLafayette CountyLake CountyLee CountyLeon CountyLevy CountyLiberty CountyMadison CountyManatee CountyMarion CountyMartin CountyMiami-Dade CountyMonroe CountyNassau CountyOkaloosa CountyOkeechobee CountyOrange CountyOsceola CountyPalm Beach CountyPasco CountyPinellas CountyPolk CountyPutnam CountySanta Rosa CountySarasota CountySeminole CountySt. Johns CountySt. Lucie CountySumter CountySuwannee CountyTaylor CountyUnion CountyVolusia CountyWakulla CountyWalton CountyWashington County
PolkPascoHillsboroughMarionLeeSumterLakeOsceolaand 59 more
A manufactured home set on a Florida lot with the permit approved
Cleared the first time. Set on schedule.
When the packet is validated before it is filed, the home gets set instead of stuck.

Built for the people who set the home.

One permit that moves, whether you pull it, sell it, or haul it.

An installer crew reviewing the validated permit on a tablet at a Florida jobsite
Installers
Pull the permit and clear review the first time, so the crew sets the home on schedule.
Dealers
Hand the buyer a permit that moves, instead of a file that stalls the sale.
Transporters
Coordinate the set with the paperwork already validated and on file.

It catches the error before the county does.

The denials that cost weeks are deterministic: the wrong district, an under-rated wind zone, a home that does not fit after setbacks. We check each one, cite the rule, and hold the packet until it is clean.

Manufactured-home wind zone cross-check (24 CFR 3280.5)
Setbacks for the parcel district, cited to the county code
Buildable-envelope fit before the home is ordered
Well to septic 75 ft separation (FL DOH 64E-6)
Flood zone and Exposure D flagged before submittal

Questions, answered straight.

Is this AI deciding what my county requires?
No. Every result is deterministic and cited to a specific county rule, so you can see the exact code reference behind it. Not a black box.
Which counties do you cover?
All 67 Florida counties, with verified, per-district setbacks cited to each county Land Development Code, plus wind zone and flood.
What if a manufactured home is not allowed on the parcel?
We flag it before you buy the lot or order the home. Some districts allow it by right, some require a special-use permit, and a few exclude it. We tell you which, with the citation.
Who pulls the permit?
A state-licensed manufactured-home installer pulls the permit (FS 320.8249). Piermits builds the validated, county-ready packet for them.
What does it cost?
Pricing is set during a short demo against your real jobs. Bring an address and a HUD data plate and we will show you the workflow before anything is committed.

See your county packet built live.

Book a 15-minute demo. Bring a real address and watch the packet come together, validated to your county and cited to the code.